169 sites became 339. Australia Post needed it done by 30 June.

When Australia Post needed power and data upgrades rolled out across its network, the brief was already tight. SCIS delivered every site on time - and when the scope doubled, the program didn't miss a beat.

  • Fixed deadline
  • Live sites
  • National program
  • Expanding scope
Australia Post
[Direct or through FM - to confirm with SCIS]
National
339 (expanded from an original scope of 169)
Power and data upgrades; Stage 2 digital screen rollout (600 screens) underway
[Project duration - to confirm with SCIS]

169 operational sites, a fixed deadline, and a scope that grew mid-program

Australia Post had 169 sites that needed power and data infrastructure upgraded, and a fixed date they had to be done by. The sites were operational - staff in, customers through the door, no tolerance for downtime - and spread across the country. The timeline left no room for slow mobilisation or gaps in coverage.

Partway through, the scope grew. The original 169 sites became 339.

One program, one point of contact, everywhere at once

SCIS drew on its vetted national subcontractor network - trades already holding the clearances, inductions and insurances needed to work in live Australia Post facilities. That meant no onboarding delays and no gaps in coverage. Every site was tracked centrally, with progress reported back before it needed to be asked for.

The original 169-site scope was delivered on time. When Australia Post extended the program to 339 sites, SCIS absorbed the additional work without restarting - same team, same systems, same standard.

Delivered in full. Then doubled.

339

Sites delivered nationally, expanded from the original 169-site brief

600

Digital screens now being rolled out across the Australia Post network in Stage 2